Key Takeaway: By integrating AutoCAD's
DATAEXTRACTION command with Excel, site engineers can reduce quantity calculation time by 70% and eliminate manual entry errors.
How to Prepare BOQ (Bill of Quantity) for Construction Projects
Introduction
BOQ is a financial document that lists all construction items with quantities and rates.
Steps to Prepare BOQ
1. Study Drawings
- Analyze structural and architectural drawings
2. List Items
- Earthwork
- PCC / RCC
- Steel work
- Finishing work
3. Quantity Calculation
- Use volume and area formulas
- Ensure accuracy
4. Apply Rates
- Use contract or schedule rates
BOQ Format
- Item Description
- Unit
- Quantity
- Rate
- Amount
Conclusion
BOQ ensures proper cost estimation and financial control.